Basic Info.
Structural Style
Multi-Pole Scaffolding
Framework
Frame Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Lapping Form
Full Scaffolding
Erection Position
External Scaffolding
Move Method
Horizontal mobile Scaffolding
Scaffolding Part Type
Scaffolding Planks
Construction Properties
Building Scaffold
Transport Package
by Container
Specification
1.1/1.2/1.3/1.4/1.5mm thickness
Product Description
high quality europa standard metal scaffolding plank
Scaffolding plank | Scaffolding plank |
210 x 45 x 1.2 x 4000 | 13.6 | 500 x 50 x 1.2 x 1829 | 15.5 |
210 x 45 x 1.2 x 3000 | 10.26 | 480 x 45 x 1.2 x 1829 | 13.5 |
210 x 45 x 1.2 x 2000 | 6.93 | 450 x 45 x 1.2 x 1829 | 13 |
210 x 45 x 1.2 x 1000 | 3.59 | 450 x 38 x 1.2 x 1829 | 12.5 |
240 x 45 x 1.2 x 4000 | 14.87 | 420 x 45 x 1.2 x 1829 | 12.5 |
240 x 45 x 1.2 x 3000 | 11.23 | 500 x 50 x 1.2 x 1219 | 11 |
240 x 45 x 1.2 x 2000 | 7.59 | 480 x 45 x 1.2 x 1219 | 10 |
240 x 45 x 1.2 x 1000 | 3.94 | 450 x 45 x 1.2 x 1219 | 9.5 |
250 x 50 x 1.2 x 4000 | 15.67 | 450 x 38 x 1.2 x 1219 | 9 |
250 x 50 x 1.2 x 3000 | 11.84 | 420 x 45 x 1.2 x 1219 | 9 |
250 x 50 x 1.2 x 2000 | 8 | 330 x 50 x 1.2 x 1829 | 11.5 |
250 x 50 x 1.2 x 1000 | 4.15 | 330 x 50 x 1.2 x 1219 | 8.5 |
FAQ
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
Address:
No. 30, Xintang Road, Xintang Town, Zengcheng District, Guangzhou, Guangdong, China
Business Type:
Trading Company
Business Range:
Construction & Decoration
Company Introduction:
Our company offers variety of products which can meet your multifarious demands.
We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers.
Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.