Basic Info.
Move Method
Lifting Bridge
Scaffolding Part Type
Scaffolding Planks
Construction Properties
Building Scaffold
Surface Treatment
Hot DIP Galvanized
Standard
as/Azs 1576 En12811, En74 BS39
Transport Package
Packing in Steel Trestles
Specification
2000*48.3*3.2mm
Product Description
size chart of ringlock:
Ringlock System Standard/48.3mmD*3.2mmT
Item No | Description | Dim(L)mm | Weight(kg) | Finishing |
HX-1135 | 0.5M | 500 | 2.98 | Hot Dip Galvanized |
HX-1136 | 1.0M | 1000 | 5.20 |
HX-1137 | 1.5M | 1500 | 7.80 |
HX-1138 | 2.0M | 2000 | 9.70 |
HX-1139 | 3.0M | 3000 | 14.80 |
HX-1140 | 4.0M | 4000 | 19.60 |
Ringlock System Ledger/48.3mmD*3.2mmT
Item No | Description | Dim(L)mm | Weight(kg) | Finishing |
HX-1141 | 0.7M | 700 | 3.40 | Hot Dip Galvanized |
HX-1142 | 1.0M | 1000 | 4.60 |
HX-1143 | 1.3M | 1300 | 6.00 |
HX-1144 | 1.5M | 1500 | 6.50 |
HX-1145 | 2.0M | 2000 | 8.40 |
HX-1146 | 2.3M | 2300 | 9.50 |
HX-1147 | 2.5M | 2500 | 10.20 |
HX-1148 | 3.0M | 3000 | 12.10 |
Ringlock System Diagonal/48.3mmD*3.2mmT
Item No | Description | Dim(L)mm | Weight(kg) | Finishing |
HX-1149 | 1.5*0.7M | 1500*700 | 8.50 | Hot Dip Galvanized |
| | | |
The Advantages of Hot Dipped Galvanzied Ringlock Scaffolds:Green environmental protection and long service life: all the surface of components are treated by hot-dip galvanizing process, with a service life of more than 15 years;
Low-cost, high-efficiency: less basic components, not easy to lose, no material loss, easy storage, transportation and storage, easy to manage;
Safer and more reliable: modular design, high strength steel, reasonable mechanical design, the maximum load of the vertical pole up to 200 KN;
Save material and transportation cost: Compared with bowl- buckle scaffolding,
save more than 1/3~2/3 of steel; Save labor cost: Set up and disassemble quickly, 4-8 times as fast as other scaffolding; The construction of step ladder is zero-disassembly type. One person can complete the construction and disassembly work.
The traditional step ladder needs 2-4 people to cooperate with the crane.
Flexibility: In addition to laying some conventional frame outside, it can also set up cantilever structure, cross-space structure, integral movement, lifting and disassembly frame.
It is widely used in the construction of interior and exterior frames, cast-in-place beams, formwork support, scaffolding, tunnel bridges, stage erection, etc.
Ringlock system scaffold is a typical modular scaffold system, including support system and scaffold construction system. Ringlock scaffold system is also known as: Chrysanthemum buckle scaffold system, chrysanthemum disc scaffold system, inserted disc scaffold system, wheel disc scaffold system, buckle disc scaffold, layer frame (layer frame, Leia frame, because the basic principle of the scaffold is invented by German laiher (Leia) company, also known as "Leia frame" by the industry. It is mainly used for the lighting frame and background frame of large-scale concerts.) Disc type multi-functional scaffold is an upgraded product after the bowl type scaffold. This kind of scaffold pole is welded with a disk every 0.50m on a certain length of steel pipe. The new and beautiful disk is used to connect the crossbar with a connecting sleeve at the bottom. The cross bar is made of plug with bolt welded on both ends of steel pipe.
FAQ
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case