Basic Info.
Move Method
Lifting Bridge
Scaffolding Part Type
Scaffolding Planks
Construction Properties
Building Scaffold
Surface Treatment
Hot DIP Galvanized
Standard
as/Azs 1576 En12811, En74 BS39
Transport Package
Packing in Steel Trestles
Specification
2000*48.3*3.2mm
Product Description
Layher Scaffolding System Ringlock Scaffolding System
size chart of ringlock:Ringlock System Standard/48.3mmD*3.2mmT
Item No | Description | Dim(L)mm | Weight(kg) | Finishing |
HX-1135 | 0.5M | 500 | 2.98 | Hot Dip Galvanized |
HX-1136 | 1.0M | 1000 | 5.20 |
HX-1137 | 1.5M | 1500 | 7.80 |
HX-1138 | 2.0M | 2000 | 9.70 |
HX-1139 | 3.0M | 3000 | 14.80 |
HX-1140 | 4.0M | 4000 | 19.60 |
Ringlock System Ledger/48.3mmD*3.2mmT
Item No | Description | Dim(L)mm | Weight(kg) | Finishing |
HX-1141 | 0.7M | 700 | 3.40 | Hot Dip Galvanized |
HX-1142 | 1.0M | 1000 | 4.60 |
HX-1143 | 1.3M | 1300 | 6.00 |
HX-1144 | 1.5M | 1500 | 6.50 |
HX-1145 | 2.0M | 2000 | 8.40 |
HX-1146 | 2.3M | 2300 | 9.50 |
HX-1147 | 2.5M | 2500 | 10.20 |
HX-1148 | 3.0M | 3000 | 12.10 |
Ringlock System Diagonal/48.3mmD*3.2mmT
Item No | Description | Dim(L)mm | Weight(kg) | Finishing |
HX-1149 | 1.5*0.7M | 1500*700 | 8.50 | Hot Dip Galvanized |
| | | |
Components of Ringlock:standard: Usually used in Q345 material of 60 *3.25, 48 *3.25 steel pipe. Hot-dip galvanizing process, according to the length of the design,the vertical bar disc buckle joint spacing should be 0.5m Modular settings, one end with a connecting rod or sleeve.
ledger: designed according to length, the length of cross bar should be set according to 0.3m modulus. Welded cross bar fastener at both ends.
diagonal brace: designed according to length and welded cable-stayed fastener at both ends.
bass collar: Welded with disc, connected with adjustable base and vertical pole.
side bracket: used for support of epitaxy platform and scaffolding system.
disk plate: 10 mm thick, Q235B steel plate.
Wedge pin: Used to lock the head of cross bar and disc.
Cable-stayed buckle joint: Wedge pin is used to clamp on the big hole of the disc.
Cross bar fastener: Wedge pin is used to clamp the disc hole.
Adjustable base jack: Used to adjust vertical height.
.U-head jack bracket: Used for supporting formwork of disc support system.
Stepping ladder and armrest: Connect upper and lower layers, easy for workers to work and walk, mainly suitable for disc scaffolding system.
Hanging steel springboard: Hanging on the disc bar through the hook, the unique hook design, seamless connection with the steel pipe, strong load-bearing, anti-skid drainage to ensure construction safety.
Ringlock system scaffold is a typical modular scaffold system, including support system and scaffold construction system. Ringlock scaffold system is also known as: Chrysanthemum buckle scaffold system, chrysanthemum disc scaffold system, inserted disc scaffold system, wheel disc scaffold system, buckle disc scaffold, layer frame (layer frame, Leia frame, because the basic principle of the scaffold is invented by German laiher (Leia) company, also known as "Leia frame" by the industry.
It is mainly used for the lighting frame and background frame of large-scale concerts.) Disc type multi-functional scaffold is an upgraded product after the bowl type scaffold. This kind of scaffold pole is welded with a disk every 0.50m on a certain length of steel pipe. The new and beautiful disk is used to connect the crossbar with a connecting sleeve at the bottom. The cross bar is made of plug with bolt welded on both ends of steel pipe.
Company InformationJET SCAFFOLD &FORMWORK SYSTEM CO.,LTD was established 2012 years covers an area of35000 Square meters in Guangzhou, We offer services with all kind of scaffolding products .We have more than 30 professional products lines .Production capacity more than 5000 tons per month.Formed a collection development ,design ,production and sales as one of the factory.provide you with one-stop engineering solutions and we accept OEM and ODM.Supply qualified products which are certified by SGS,BV,EN39,intertek Test Report,Local Test Report.Strict QC ensure the product quality.In China we have 3 factories are in Tianjin,Dongguan and foshan.Our product sell over the world such as American Australian,European,the Middle East Africa etc.
FAQ
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according to the order status
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8 subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case