Basic Info.
Framework
Frame Combined Scaffolding
Supporting Mode
Floor Type Scaffolding
Move Method
Horizontal mobile Scaffolding
Scaffolding Part Type
Scaffolding Planks
Test Report
SGS/En12811/Ce/BS74/AS/NZS1576
Transport Package
Pack in Trestle
Specification
2000*48.3*3.2mm
Product Description
New system specifications scaffolding cuplock accessories
Cuplock scaffolding system use for building bridges and engineering construction
1.One set of Cuplock Scaffolding usually include 4 standards and 8 ledgers.
2.Cuplock Scaffolding is easy and quick to install and strip.which can save your time.
3.Cuplock Scaffolding provides high loading capacity while its structure is quite flexible.
4.All the Cuplock Scaffolding parts are dealt with CO2 arc welding, the surface is galvanized. As a result, it is more durable and has a longer working life
5.There is small lock pin on Cuplock verticals to restrict the cups from moving out. so you don't worry to lost ancillaries
Specification
1.Standard
Item Number | Length(mm) | Diameter(mm) | Thickness(mm) |
SSC-C1-3000 | 3000 | 48.3 | 3.2 |
SSC-C1-2500 | 2500 | 48.3 | 3.2 |
SSC-C1-2000 | 2000 | 48.3 | 3.2 |
SSC-C1-1500 | 1500 | 48.3 | 3.2 |
SSC-C1-1000 | 1000 | 48.3 | 3.2 |
2.Ledger
Item Number | Length(mm) | Diameter(mm) | Thickness(mm) |
SSC-C2-2500 | 2500 | 48.3 | 3 |
SSC-C2-1800 | 1800 | 48.3 | 3 |
SSC-C2-1600 | 1600 | 48.3 | 3 |
SSC-C2-1500 | 1500 | 48.3 | 3 |
SSC-C2-1300 | 1300 | 48.3 | 3 |
SSC-C2-1250 | 1250 | 48.3 | 3 |
SSC-C2-1200 | 1200 | 48.3 | 3 |
SSC-C2-1000 | 1000 | 48.3 | 3 |
SSC-C2-900 | 900 | 48.3 | 3 |
SSC-C2-600 | 600 | 48.3 | 3 |
3.Brace
Item Number | Length(mm) | Diameter(mm) | Thickness(mm) |
SSC-C3-1800*1500 | 1800*1500 | 48.3 | 2.5 |
SSC-C3-1800*2000 | 1800*2000 | 48.3 |
SSC-C3-2500*1500 | 2500*1500 | 48.3 |
SSC-C3-2500*2000 | 2500*2000 | 48.3 |
We can provide different sizes of Cuplock scaffoldings for you.
FAQ
1. Question: What's your MOQ(minimum order quantity)?
Answer: One full container.
2. Question: What's your packing methods?
Answer: Packed into bundle, and rest in bulk.
3. Question: What's your payment terms?
Answer: T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C 100%, or negotiate according
to the order status
4. Question: What's your delivery time?
Answer: 10-20 days after received the advance payment or L/C.
5. Question: Are you manufacturer or trader?
Answer: We are the munafacturer of SCAFFOLDINGS MATERIALS for decade years. Our group company has 8
subsidiaries and 4 factories, coveraged every scaffolding systems.
6. Question: Where's your factory?
Answer: Our factory is in Tianjin city (near Beijing) and Jiayu city, Hubei Province, afforded enough production ability
and earlier delivery time.
7. Question: Can we visit your factory?
Answer: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your
case.
8. Question: Can you supply other scaffolding materials?
Answer: Yes. All related scaffolding materials.
(1) scaffolding system (cup-lock system, ring lock system, frame, pipe&coupler system)
(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hop dipped galvanized/ black. BS1139, STK500
(3) steel pipes (ERW BS1387, SSAW PIPE, Sqaure/ Rectangular tube GB/T6728)
(4) steel coupler (preesed / drop forged coupler)
(5) steel plank with hooks or without hooks
(6) steel stair case
Address:
No. 30, Xintang Road, Xintang Town, Zengcheng District, Guangzhou, Guangdong, China
Business Type:
Trading Company
Business Range:
Construction & Decoration
Company Introduction:
Our company offers variety of products which can meet your multifarious demands.
We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers.
Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.